Insight
One atomic statement made by an expert, a student or a publication, with its evidence status.
Expert Open for expert review · What do these labels mean?
Once the ribbon is cut the design and BIM models are abandoned; the studio’s next AI frontier is the production phase, where the accumulated model data is currently wasted.
— Paraphrased from the lecture
| Where in the source | Q&A — anchor: “no one really cares about them” |
| Confidence | high |
Context
In the Q&A a student asked how long a project takes from first idea to the finished building. Jakob Strømann-Andersen (Henning Larsen) answered four to six years, noted that most of his AI examples concern the early design phase, and said the next step is the production phase.
From the transcript
When you’re looking at the AI, most of the examples I showed you here was on upfront […] On the concept generation, what we are looking into for the next step is more on the production phase. So we have […] a lot of things that we have at the [BIM] model […] but no one really cares about them. When we have cut the red thread and open the building, no one cares about what we designed, the [BIM] models. That is what we’re looking into now.
Automatic transcript, Q&A (no timestamp in the transcript). Lightly cleaned: repeated words and fillers removed, omissions marked […], editorial insertions in [brackets].
Connections
Something wrong or missing? Suggest a correction