That same fully electrified plant is currently running at roughly 20–30% of production with all technology already installed and waiting.

— Paraphrased from the lecture

Where in the source~00:13 — anchor: “still around 20 or 30% of the”
Confidencehigh

Context

Fojtík (Panattoni) adds to the Hanon example in Kladno (a fully electrified plant built to BMW’s requirements), linking it back to his earlier point that industrial tenants ramp production up slowly.

From the transcript

So it’s a very complex task to finish such a buildings and how I mentioned the beginning they are still in the around 20 or 30% of the production. So the whole technology is already installed, but they are waiting for the [full] scale.

Automatic transcript, presentation, 00:11:23. Lightly cleaned: repeated words and fillers removed, omissions marked […], editorial insertions in [brackets].

Editorial note

— a large capital and carbon investment sitting idle by design.

An interpretation added when the claim bank was compiled — not said in the lecture.