Under the recast EPBD, all new non-residential buildings over 250 m² must have solar installed by 31 December 2026 where suitable and feasible; existing non-residential buildings over 500 m² must follow by 31 December 2027 when undergoing major renovation or permitted roof works. From 29 May 2026 every new building must be designed “solar-ready” — orientation, roof design and structural capacity to carry future panels.