Site, general contractor and basic concept are all ready before the client is signed, but the entire construction must be delivered within 12 months — and the concept still has to be reworked in the first few months around a client technology the client itself cannot yet specify.
— Paraphrased from the lecture
| Where in the source | ~00:04 — anchor: “The time pressure of the construction is still same” |
| Confidence | high |
Context
Pavel Fojtík (sustainability manager for Czechia and Slovakia at Panattoni) opens with the energy concept of industrial buildings. He describes how much more complex the technology has become (heat pumps, PV, battery storage, EV charging, the client’s own process technology), while the developer’s construction timeline has stayed the same.
From the transcript
So now the game is a bit different, but interesting, much more interesting. The thing is that the time pressure of the construction is still same. When we signed a client, we have ready site, we have ready general contractor, we have ready basic concept, but in the 12 months we need to deliver all the construction. […] What are the question[s] at the beginning are usually clients technology? In the first few months we have to change the concept especially to the client’s needs and that’s the tricky part because usually client don’t know exactly which kind of technology will be in the building.
Automatic transcript, presentation, 00:03:10. Lightly cleaned: repeated words and fillers removed, omissions marked […], editorial insertions in [brackets].