Certain from the start they would not build in concrete and steel, the team still calculated the full carbon cost of a conventional structure purely as a scoring baseline — yielding a claimed ~30–37% reduction on structural decisions alone.
— Paraphrased from the lecture
| Where in the source | ~00:31 — anchor: “we did create a measure of what would the structure have cost us in carbon” |
| Confidence | check — the reduction figure is garbled in the transcript |
Context
Ingvartsen explains how a life-cycle assessment (LCA) tracked carbon through every design stage of the timber building. To score the structure, the team calculated the carbon of a conventional concrete-and-steel structure as a reference. The reduction figure itself is garbled in the automatic transcript (it reads as a run of ‘30’ and ‘37’), so the ~30–37% range is uncertain.
From the transcript
So even though we were quite certain that we would not construct the building out of concrete and steel, we did create a measure of what would the structure have cost us in carbon, to have that as a baseline, and then we could score our material choices […] by comparing it to that baseline. So alone on the structural decisions we started with a [30–37, garbled in the transcript] percent reduction, and that process has then carried on into all other areas of the building.
Automatic transcript, presentation, 00:43:23. Lightly cleaned: repeated words and fillers removed, omissions marked […], editorial insertions in [brackets].
Transcription
The number or wording may have been garbled in the transcript, or the speaker hedged it (percentage garbled in transcription). To be checked against the recording.
Connections
- Source: Big Box, Small Footprint – Lessons from Bestseller’s Low-Carbon Logistics Campus
- Challenges: Embodied carbon of new and demolished warehouses
- Metrics: Embodied carbon intensity
- Reference projects: Bestseller Logistics Center West
Something wrong or missing? Suggest a correction