Insight
One atomic statement made by an expert, a student or a publication, with its evidence status.
Expert Open for expert review · What do these labels mean?
A resilience tool built on an optimistic scenario will report that your building has few risks — and the optimistic scenarios are already being missed “by far.”
— Paraphrased from the lecture
| Where in the source | ~46:00 — anchor: “let’s make sure which scenarios it is built on” |
| Confidence | high |
Context
After Jakub Veselka explains the IPCC climate scenarios (RCPs and SSPs), Miroslav Král (EY) adds a practical note for students who will use climate-risk tools on their buildings.
From the transcript
So when you are assessing risk or using some tool to assess risk for your buildings, it is important to note based on which scenario this model is built on. Because if the model is built on this scenario really optimistic and we are missing it already by far […] it will show you that the building probably does not have that many risks to consider. But on the other hand, if you are something close to reality, which is nowadays the grey one and the yellow one, it will behave differently. So just the note for you, let’s make sure when you are taking conclusion from some tool, let’s make sure which scenarios it is built on because it really matters.
Automatic transcript, presentation, 00:45:46. Lightly cleaned: repeated words and fillers removed, omissions marked […], editorial insertions in [brackets].
Editorial note
The single most transferable warning:
An interpretation added when the claim bank was compiled — not said in the lecture.
Connections
Something wrong or missing? Suggest a correction