Source · published
Where an insight comes from — an expert lecture, a student questionnaire, or an external publication.
| Kind | lecture |
| Speaker | Jakub Veselka, Miroslav Král |
| Affiliation | EY |
| Date | 2026-05-05 |
| Status | published |
Lecture 17 of the Rethinking.Logistics expert lecture series at ARCHIP, 05.5.2026.
Lecture announcement
What makes a building a valuable asset?
Structural safety is only the starting point; long-term value depends on much more. Today, buildings must also be functional, resilient and keep their value over time. Drawing on their professional experience, Jakub and Miroslav offer a business-oriented perspective on risk management. Managing risk well requires not only technical expertise, but also clear communication across teams. They will show how risk management can move beyond a box-ticking exercise and become a valuable tool for both developers, designers, and asset owners.
From the announcement of the lecture series (LinkedIn, RethinkingLogistics).
About this source
Architects habitually think only at asset level, while the money, the regulation and the survival question all sit at corporate portfolio level. A building is reframed as a risk object inside someone’s balance sheet: physical climate risks (acute and chronic) plus transition risks and opportunities, assessed against a named IPCC scenario and time horizon, then answered with adaptation measures that are cheapest when designed in rather than retrofitted. The practical payload is a free tool that lets a designer run a building-level climate exposure/vulnerability diagnosis in 15–30 minutes using data an architect already has.
Summary paraphrased from the lecture.
Connections
- Insights: 1,500 assets screened in a week — on five data fields, 78 of 87 assets already at high drought risk, A company that owns nothing but its people’s time, A portfolio’s climate exposure priced at ~EUR 30 million, A rain garden answers four risks at once, Adaptation is a design-phase decision, not a facilities one, Adaptation measures come with real cost ranges, Always ask which scenario the tool assumes, Architects design assets; money lives at portfolio level, Buying a building is buying a pig in a poke, Carbon price is a design input, not an accounting footnote, Climate risk splits four ways, not two, CSRD is what actually buys the analysis, ESG entered the risk register only ~2 years ago, Exposure is easy; vulnerability is the design question, For Czechia the risks are drought, floods, precipitation, Four coping strategies, including doing nothing, Free tool, 15–30 minutes, no registration for the basics, Oversize the wires now, Owners don’t know where their own buildings are, RCP 8.5 called the most reasonably dirty one, Risk analysis also finds the upside, Risk management is not a risk manager, The risk model runs on ordinary architectural parameters, The stranded gas station as a design brief, The whole point is being in business in 20 years, They tested it on their own office and found flood risk, Two knobs decide everything – scenario and horizon, Warming has social consequences that are also risks
Something wrong or missing? Suggest a correction