Insight
One atomic statement made by an expert, a student or a publication, with its evidence status.
Expert Open for expert review · What do these labels mean?
Once you decide the building is modular, you can react to “make it longer, wider” during the years of design without changing the system.
— Paraphrased from the lecture
| Where in the source | mid — anchor: “once you decide that the building is modular” |
| Confidence | high |
Context
František Novotný (CREA-TURA), presenting the multi-storey food (cake, biscuit and snack-bar) factory in the centre of Frýdek-Místek, built on a former textile-factory brownfield next to housing, a school and the river, turns to the questions asked in the design process — whether the building is modular, reusable, low in CO2 — and explains what modular prefabricated construction offers during the years-long design of a factory.
From the transcript
And right now we know that we can do modular buildings. We can do them very easy. We can order everything. It can be prefab. It helps you with the designing process because once you decide that the building is modular, you can, within the design process, which takes years for a factory of this type, within those years of designing, of making the project, you can very easily react to the let’s make it longer or let’s make it wider because you know how to do it and what to do. It doesn’t make any change in the […] system how that’s built.
Automatic transcript, presentation, 00:57:06. Lightly cleaned: repeated words and fillers removed, omissions marked […], editorial insertions in [brackets].
Editorial note
modularity buys design agility, not just construction speed.
An interpretation added when the claim bank was compiled — not said in the lecture.
Connections
Something wrong or missing? Suggest a correction