Insight

One atomic statement made by an expert, a student or a publication, with its evidence status.

Expert Open for expert review · What do these labels mean?

Asked whether LEED prevents green area being scattered into meaningless fragments (strips between parking bays) rather than kept continuous for biodiversity, the speaker could not point to a contiguity requirement — only a hunch that a half-square-metre patch would not be counted.

— Paraphrased from the lecture

Where in the source~01:09 (Q&A) — anchor: “in the middle of concrete square”
Confidencehigh

Context

In the Q&A a student asked whether LEED has clear rules on the continuity or size of green areas around a building, since they are often split into small patches, such as green strips between parking spaces, that make little sense for biodiversity. Petr Zahradník (EkoWATT) answers that he is not sure.

From the transcript

To be honest, I’m not sure if that’s some minimum requirement, but I think there are some minimal areas that can be counted into the, I would say, green ratio or something. So if you have a [patch] of 1/2 square meter of some green somewhere in the middle of [a] concrete square, it will probably not be counted. […] but I don’t know what is the limit in detail because there are so many […] that I don’t remember these things, sorry.

Automatic transcript, Q&A, 01:09:03. Lightly cleaned: repeated words and fillers removed, omissions marked […], editorial insertions in [brackets].

Connections


Something wrong or missing? Suggest a correction