Reference project · published

A built or planned logistics project from practice, outside the studio. Figures are as published by the developer, the architect or a cited source.

DeveloperSEGRO and St George (Berkeley Group)
LocationAlperton / Park Royal, North West London, UK (on the North Circular, A406)
Year2024
Stagebuilt
Typologymulti-storey industrial: six storeys, loading and parking on two lower levels, units on four upper levels
Site area1.7 acres
Floor area134,500 sq ft
CertificationsBREEAM Excellent (targeted)
Websitewww.segro.com/media/news/2024/190424-segro-and-st-george-com
Statuspublished

Also known as: V-Park Grand Union

🌐 Open the project website

Project

SEGRO V-Park Grand Union is a multi-storey industrial building in Alperton, North West London, developed by SEGRO and St George (Berkeley Group) and completed in April 2024. It provides 134,500 sq ft over six storeys on a 1.7-acre site: two lower levels hold loading bays and parking, and four upper levels hold self-contained industrial units of various sizes, served by cargo lifts. Shared amenities include break-out and meeting rooms, a roof terrace and a reception service.

The building sits within the 22-acre Grand Union regeneration, where St George is building a mixed-use neighbourhood of 3,350 homes, 35% of them affordable. It targets BREEAM Excellent and has photovoltaic cells, an internal green wall and 20 charging points for electric cars and vans.

No image is included: the developer’s press images require a licence from SEGRO, and no openly licensed photo was found.

Source: SEGRO, April 2024.

Metrics and evidence

MetricWording in the sourceValueHow it was calculatedToolSource
Land takefloorspace from a 1.7-acre site134,500 sq ft on 1.7 acres (floor area about 1.8 × site area)Ratio calculated here from the two published figures (1 acre = 43,560 sq ft).manual / formulaSEGRO, April 2024
Jobs createdjobs and apprenticeshipsup to 250 once fully letDeveloper’s estimate.not statedSEGRO, April 2024
Parking capacityEV charging points20 for electric cars and vansCount as published.not statedSEGRO, April 2024
Rooftop PV generationphotovoltaic cellsnot stated—not statedSEGRO, April 2024

Tools

  • Not stated by the developer.

Open questions

  • The architect, the number of units and loading bays, and whether BREEAM Excellent was achieved are not stated in the press release.