Metric · draft
A measurable indicator (students often call it a KPI) used as evidence for a design decision.
| Category | Social |
| Unit | jobs |
| How it is calculated | Number of jobs (FTE) created on site, by function. |
| Origin | student |
| Status | draft |
Also known as: Local economic activation
What it measures
Economic and social contribution of the project to its area — often in tension with automation.
Calculation
Number of jobs (FTE) created on site, by function.
Connections
- Used in case studies: Julia Godard Lombard, Roshni Basu
- Informs decisions on: Urban integration of logistics buildings, Automation and operational efficiency of logistics
Something wrong or missing? Suggest a correction