Metric · draft

A measurable indicator (students often call it a KPI) used as evidence for a design decision.

CategorySocial
Unitjobs
How it is calculatedNumber of jobs (FTE) created on site, by function.
Originstudent
Statusdraft

Also known as: Local economic activation

What it measures

Economic and social contribution of the project to its area — often in tension with automation.

Calculation

Number of jobs (FTE) created on site, by function.

Connections


Something wrong or missing? Suggest a correction