Insight

One atomic statement made by an expert, a student or a publication, with its evidence status.

Expert Open for expert review · What do these labels mean?

Flood risk analysis obtained from the insurer was modelled at concept stage; when the 2024 flood came, the roads around the Kojetín Amazon park went under water almost exactly as modelled, but the facility kept operating. One day of stopped production is a “terrible cost”.

— Paraphrased from the lecture

Where in the source~00:32 — anchor: “the flood which was in 2024 around the Amazon”
Confidencehigh

Context

Fojtík (Panattoni) shows a flood risk analysis from an insurance company for the small Amazon park in Kojetín (garbled as “Koi Kina” in the transcript) next to photos of the 2024 flood around the same site.

From the transcript

But what is important to see is the risk analysis regarding the water. On the right side of the picture is the analysis what we get from the insurance company. […] Here is the Amazon small Amazon park […] the [flood] risk analysis. But the reality looks almost the same like the model before. So this is the [flood] which was in 2024 around the Amazon in the [Kojetín] and see how the routes are under the water, maybe different businesses under the water, but Amazon can still run the business because we calculated with a model before and I don’t have the number in my mind, but to stop such a factory for one day, it’s a terrible, terrible cost. So you need to be aware of it and you need to calculate such a risk assessment before.

Automatic transcript, presentation, 00:30:08. Lightly cleaned: repeated words and fillers removed, omissions marked […], editorial insertions in [brackets].

Editorial note

, so hydrological modelling is business continuity, not compliance.

An interpretation added when the claim bank was compiled — not said in the lecture.

Connections


Something wrong or missing? Suggest a correction