Trade-off · published
A recurring conflict between two design aims or metrics, found in the student projects or reported by experts and publications, with how the projects handled it.
| Summary | Fewer docks, cleaner vehicles and tighter yards reduce footprint and emissions, but can lower throughput and operational tolerance. |
| Status | published |
The conflict
Cargo bikes, fewer docks and compact bays cut paved area and emissions. They also reduce capacity at peak demand or demand more precise operation, unless the layout is redesigned around them.
In the student projects
- Khrystyna Verbitska — Prioritising cargo-bike deliveries lowers CO2 emissions and urban traffic impact but reduces throughput and scalability, especially at peak demand (emissions vs. logistics capacity).
- Hynek Hrabík — Removing docks cuts paved surface, but in a conventional layout it reduces throughput (40 classic docks bottleneck at about 245 vs about 250). Only the flow-through layout keeps throughput with fewer docks.
- Hynek Hrabík — Bays without buffer zones and visual guides demand more precise truck manoeuvring and reduce flexibility, an operational risk traded against footprint (questionnaire 4.4).
As reported by the student; see each case study for the page in the portfolio.
Connections
- Case studies: Khrystyna Verbitska, Hynek Hrabík
- Metrics in conflict: Truck throughput, Number of docks, Yard area per dock, Impervious surface ratio, Last-mile delivery emissions
- Domains (through its projects): Micro-Hubs and Urban Mobility
- Ambitions (through its projects): Cargo bikes and light electric vehicles, Compact footprint, Efficient truck flow and compact yards, Fewer and cleaner last-mile trips, Habitat and ecological connectivity, Logistics as part of the city, Micro-hub networks, Multi-storey logistics, Public access and community use, Rainwater kept on site, Reuse of existing buildings
Something wrong or missing? Suggest a correction