Trade-off · published
A recurring conflict between two design aims or metrics, found in the student projects or reported by experts and publications, with how the projects handled it.
| Summary | A larger data-centre share gives more recoverable heat but uses more energy and water and displaces programmes that create jobs. |
| Status | published |
The conflict
In energy-symbiosis projects, more servers mean more waste heat to share with neighbours. They also raise energy and water demand, take the place of more labour-intensive uses, and still need full cooling capacity for the hottest day.
In the student projects
- Julia Godard Lombard — Raising the data-centre share increases heat production, recoverable heat and heat-recovery radius, but lowers the jobs created (social impact) as sauna and dry-food production are removed by P3.
- Julia Godard Lombard — More servers raise recoverable heat but also raise energy consumption and water consumption, which grow with the data-centre share.
As reported by the student; see each case study for the page in the portfolio.
What experts say
- Data centres are giant heaters — They must hold ~100% uptime through the hottest summer day, so they need chiller capacity sized for the worst case regardless of waste-heat recovery.
Paraphrased from the lecture; see each insight for its source and evidence status.
Connections
- Case studies: Julia Godard Lombard
- Metrics in conflict: Waste heat recovery, Heat recovery radius, Water consumption, Power usage effectiveness, Jobs created
- Expert insights: Data centres are giant heaters
- Domains (through its projects): Energy Symbiosis
- Ambitions (through its projects): Logistics as part of the city, Low energy and water demand, Mixed use and function stacking, Reuse of existing buildings, Shared waste heat
Something wrong or missing? Suggest a correction