Case study · draft

A student project from the Rethinking.Logistics studio showing how tools deliver metrics for decisions.

StudentAmy Naprstek
ProjectNomadic Logistics
Portfolioheyzine.com/flip-book/83615b1515.html
StudioAD4
Year2026
LocationNot named; example brownfield/industrial site between a residential district and a greenfield (site map p. 10, approx. 300 m walk from housing)
TypologyTemporary modular (relocatable) storage warehouse combined with public space
Statusdraft

📖 Open the portfolio

Project

The project responds to logistics centres being rigid, oversized permanent structures that cannot grow or shrink with demand and offer little to neighbouring residential areas. It proposes a relocatable storage system built from prefabricated steel-framed, aluminium-clad blocks in three sizes, derived from an existing exhibition block system (Showblock), with removable aluminium floor panels for uneven ground. Blocks can be configured in many layouts that combine storage with a temporary public programme such as a festival, exhibition, market or education centre. Configurations are meant to stay for between 3–5 months and up to 3 years to avoid permitting, after which the site is left as a grassy plot. A planted gradient from mown grass to long grass and flowers links the site to an adjacent greenfield to support pollinators, birds and small mammals.

How the student framed the challenge

  • Rigid, oversized permanent warehouse structures
  • Land take and landscape fragmentation
  • Urban integration of logistics near housing
  • Design for disassembly and relocation

Metrics and evidence

Every metric the project used, as named by the student, with the value, the calculation and the portfolio page.

MetricStudent’s wordingValueHow it was calculatedToolPage
Biodiversity net gainKPI: Biodiversity net gain / Biodiversity GainBaseline 5% vs proposal 75% (bar chart)Percentage increase in biodiversity achieved through habitat creation or restoration relative to the site baseline; the habitat gradient is short grass, long grass and flowers next to the road.not stated11
Land takeKPI: Area covered (questionnaire: Biotope area factor; Edge density)Old site 90% vs modular configurations ‘varies’; four configurations labelled 188%, 128.7%, 51%, 173%The text defines it as total edge length relative to total area, showing how much the structure fragments the landscape. The diagrams compare the old permanent building footprint with module layouts.not stated12
Design for disassembly scoreKPI: Disassembly scoreConventional 0 vs proposal 10Qualitative rating of how easily, efficiently and non-destructively the building can be taken apart at end of life. It rests on prefabricated blocks with removable shared faces and removable aluminium floor panels.manual / formula13
AdaptabilityTimeline comparisonTypical centre: site selection 2–6 months, feasibility 1–3, design 4–12, permitting 2–6, site prep 1–2, construction 4–8, interior 1–2 months. Modular system: 60–120 days for selection, feasibility and design plus 4–20 days for site prep, assembly and finishing. Redevelopment evaluation every 10–14 months; a configuration lasts 3–5 months up to 3 yearsPhase durations of a typical logistics centre are compared with the modular system.manual / formula14, 15
Distance to housing300m for people300 mWalking route length from the residential area to the site, measured on the site map.not stated10
AdaptabilityTemporary floor paneling50 linear metres fitted by 2 people in 1–2 hoursProduct data for the temporary aluminium floor panels.not stated7

Tools

No digital tool is named in the portfolio — values were estimated by hand, taken from literature, or not quantified.

Trade-offs

  • Low thermal insulation of the lightweight relocatable blocks (thermal comfort, ability to store climate-sensitive goods) is traded against lower operational cost and lower embodied/operational carbon (questionnaire).
  • Relocatability and low site impact (area covered, biodiversity gain) come at the cost of truck transport emissions for moving the blocks, which the student has not yet quantified (questionnaire 4.4).

Decision

The evidence backs relocatable prefabricated blocks with removable faces and floor panels instead of a permanent hall. Configurations are capped at three years and the land is returned to grass and meadow afterwards, so that site coverage stays low and biodiversity rises.

Open questions

  • At mid-term, material and structural system not yet defined; no two alternatives at opposite ends of the trade-off yet (questionnaire).
  • Energy demand, electricity price, CapEx/OpEx and grey-water strategy not quantified (questionnaire).
  • Native species not researched; transport emissions from relocating units not accounted for (questionnaire).
  • Self-reported gaps in research depth and presentation (questionnaire 6.2).