Metric · draft
A measurable indicator (students often call it a KPI) used as evidence for a design decision.
| Category | Logistics operations |
| Unit | time or effort to reconfigure |
| How it is calculated | Time (or cost) to reconfigure, extend or relocate the building or its partitions; checked against module dimensions and connections. |
| Origin | student |
| Status | draft |
Also known as: Flexibility and expandability · Partition reconfiguration time · Scalability · Time from site selection to completed building · Floor panel installation rate · Module size
What it measures
Logistics changes faster than buildings — adaptable structures avoid demolition.
Calculation
Time (or cost) to reconfigure, extend or relocate the building or its partitions; checked against module dimensions and connections.
Connections
- Used in case studies: Adéla Berkovitz, Amy Naprstek, Elsa Hauksdottir, Eva Kažukolovaitė, Julia Godard Lombard
- Informs decisions on: Adaptable and relocatable logistics structures
Something wrong or missing? Suggest a correction