Challenge · draft
A design challenge tackled with evidence-based design.
| Category | Operations |
| Status | draft |
Challenge
Automation and new technology change how much space, energy and labour logistics needs — and the quality of the remaining jobs.
Design questions
- How many workers does the facility need at a given throughput?
- How does automation change the building’s size and energy use?
- How fast can goods move through the supply chain?
Where are the metrics, tools and case studies?
They appear automatically below under Connections, and in Obsidian under the
auto_properties.
Connections
- Case studies: Johannes Berger
- Metrics: Carbon per pallet handled, Delivery time, Dock turnaround time, Energy per package delivered, Jobs created, Level of automation, Space utilisation, Throughput per site area
- Tools (via metrics): Grasshopper
Something wrong or missing? Suggest a correction