Metric · published

A measurable indicator (students often call it a KPI) used as evidence for a design decision.

CategoryLogistics operations
Unit% (per system)
How it is calculated(Provided capacity − required capacity) ÷ required capacity × 100, calculated separately for each system
Originadapted
Evidence gapsNo tool calculates it and no project has measured it.
Statuspublished

What it measures

How much capacity the building provides beyond what its user actually needs.

Calculation

(Provided capacity − required capacity) ÷ required capacity × 100

Calculated separately for each system:

  • floor area and clear height
  • floor load capacity
  • number of docks and yard area
  • car and truck parking
  • heating, cooling and ventilation capacity

Data needed

The required capacity comes from a tenant brief, operational data or post-occupancy metering. In speculative development the tenant is unknown at design stage, so the ratio can only be calculated after occupation or against a reference operation.

Space utilisation · Adaptability · Embodied carbon intensity

Tools

None known. Candidate for a new tool (see Evidence gaps).

Connections


Something wrong or missing? Suggest a correction