Biodiversity

MetricUnitHow it is calculatedToolsUsed inOrigin
Biodiversity net gain% change in biodiversity units(Post-development biodiversity units − baseline units) ÷ baseline × 100, where units = habitat area × distinctiveness × condition (e.g. the UK statutory metric).Rhino.Ecologic7adapted · UK Biodiversity Net Gain metric
Biotope area factorindex 0–1Σ(area of each surface type × its ecological weighting factor) ÷ total site area (Berlin BAF method).Grasshopper1adapted · Berlin Biotope Area Factor (BAF)
Ecological connectivityqualitative (connected / not connected)Mapping whether site greenery links to nearby corridors, water bodies and habitats (distance and continuity of green links).—2student
Function stacking indexindex 1–5 (or % of surface area with ≥ 2 functions)Σ(area of each surface × number of functions it serves) ÷ total surface area (ground + roof + facade). Functions: logistics operation, stormwater handling, habitat, human amenity, energy.—5adapted
Green area ratio% of site (or m²)Vegetated area ÷ total site area × 100.Grasshopper, Lands Design11student
Green plot ratioindexTotal leaf area (leaf area index × planted area) ÷ site area.—1adapted
Green roof coverage% of roof areaVegetated roof area ÷ total roof area × 100.Grasshopper3student
Native species richnessnumber of speciesCount of native plant (or animal) species supported on site, from planting plan or survey.Rhino.Ecologic4student
Tree count and canopy covertrees/ha or % canopyNumber of trees (or crown area) on site ÷ site area; compared before and after the design.Lands Design3student

Carbon

MetricUnitHow it is calculatedToolsUsed inOrigin
Biodiversity stress from materialsPDF·m²·yearLife-cycle impact on species loss caused by material extraction and production (potentially disappeared fraction of species), calculated in LCA software.One Click LCA1adapted
Carbon per pallet handledkgCO2e/palletAnnual (operational or whole-life) carbon ÷ pallets handled per year.—1student
Carbon sequestration by plantingtCO2/ha·yearPlanted area × sequestration rate of the vegetation type (from literature).—2adapted
Carbon usage effectivenesskgCO2e/kWh (IT)Total CO2 emissions caused by the facility’s energy use ÷ IT equipment energy.—1standard · The Green Grid
Design for disassembly scorescore 0–10Checklist score: dry/reversible connections, standard modules, material passports, separable layers.—1adapted
Embodied carbon intensitykgCO2e/m²Material quantities × emission factors from EPDs/databases, summed over life-cycle modules (A1–A3 or A1–C4) ÷ gross floor area. Calculated with LCA tools such as One Click LCA or Bombyx.Bombyx, CO2mpare, LearnCarbon, One Click LCA9standard · EN 15978
Embodied carbon saved by reusetCO2eEmbodied carbon of an equivalent new building − embodied carbon of the retrofit (reused structure counted as zero or reduced).One Click LCA3adapted
Last-mile delivery emissionstCO2/yearVehicle-km per year for each delivery mode × emission factor of that mode (kgCO2/km).—3adapted
Life-cycle impact by stage% of total impact per moduleLCA result split by EN 15978 modules (A1–A3, A4, A5, B, C) for each impact indicator.One Click LCA1standard · EN 15978
Material reuse share% (or count of reused elements)Reused or recycled material (by mass, volume or number of elements) ÷ total material × 100.—2student
Operational carbonkgCO2e/m²·yearAnnual energy use per energy carrier × emission factor of that carrier (e.g. grid kgCO2e/kWh).Dragonfly, Honeybee, nPro, URBANopt6standard
Whole-life carbontCO2e/year (annualised)(Embodied carbon + operational carbon over the reference period) ÷ number of years.CO2mpare, One Click LCA1adapted · EN 15978

Comfort

MetricUnitHow it is calculatedToolsUsed inOrigin
Daylight autonomy% of occupied hoursShare of occupied hours in which a point reaches a target illuminance (e.g. 300 lux) from daylight alone, simulated with Radiance-based tools.Honeybee, Pollination2standard · DA300 / EN 17037
Indoor air qualityppm CO2Indoor CO2 concentration as a proxy for ventilation quality; target e.g. below 900 ppm.—1standard · WELL
Natural ventilation potential% of floor area / hoursShare of floor area (or hours) that can be ventilated naturally, based on opening area, depth and climate.Butterfly1adapted
Noise leveldB(A)Noise mapping (from municipal noise maps or simulation) at façades and outdoor spaces; reduction compared with the existing state.Geoportal Praha4student
Pedestrian-level wind speedm/sCFD simulation of wind around the buildings at about 1.5 m height for prevailing wind directions; compared with comfort criteria (e.g. Lawson).Butterfly, Eddy3D, Jifto1adapted · Lawson criteria
Sun exposure of outdoor space% of area or hours of direct sunSunlight-hours analysis on the ground plane for key days (e.g. equinox, summer solstice).Cyclops, Jifto, Ladybug2student
Thermal comfortPMV / UTCI / % in comfort zoneIndoor: Predicted Mean Vote (PMV) or adaptive comfort; outdoor: Universal Thermal Climate Index (UTCI), simulated from weather data.Eddy3D, Honeybee, Jifto, Ladybug, Pollination1standard · EN 16798 / ASHRAE 55
Urban heat island effect°C above referenceSurface or air temperature difference to a rural reference, simulated or from satellite maps.Dragonfly2student
Wind conditionsm/s and % of hours by directionWind rose from a weather file (EPW) or wind atlas: frequency of wind speeds per direction.Eddy3D, Jifto, Ladybug2standard
Worker well-beingscore / % satisfiedPost-occupancy survey or checklist score of daylight, views, rest areas, greenery and facilities for workers.—4student

Economy

MetricUnitHow it is calculatedToolsUsed inOrigin
CapEx–OpEx ratio% / % over 30 yearsInvestment cost vs. sum of operating costs over a 30-year life (undiscounted or as net present value).One Click LCA3student
Construction costEUR/m²Cost estimate per gross floor area; or cost of a building element (e.g. envelope) derived from its quantity.Galapagos2student
Electricity priceCZK/kWh or EUR/kWhBusiness electricity tariff at the project location, including grid fees.—3standard
Last-mile delivery costEUR/delivery or % changeTotal cost of the final delivery step ÷ number of deliveries.—2adapted
Social cost of carbonEURTotal emissions (tCO2e) × a carbon price per tonne.One Click LCA1standard

Energy

MetricUnitHow it is calculatedToolsUsed inOrigin
Energy per package deliveredkWh/packageEnergy used by the delivery mode over a route ÷ number of packages delivered.—1adapted
Energy use intensitykWh/m²·yearAnnual delivered energy ÷ gross floor area. Simulated (e.g. Honeybee/EnergyPlus) or taken from metered data or benchmarks.Dragonfly, Honeybee, Pollination, URBANopt9standard · NZEB / EU benchmarks
Heat recovery radiusmDistance within which recovered heat can be delivered usefully: available heat output vs. heat losses of the connecting network per metre.—1student
Heating energy demandkWh/yearSum of space-heating demand over a year; simulated, or estimated from heated volume × heat-loss coefficient × degree days.Honeybee, nPro, Pollination1student
On-site renewable energy share% of demandOn-site renewable generation ÷ total annual energy demand × 100.Dragonfly, nPro, URBANopt4student
Power usage effectivenessratio (≥ 1.0)Total facility energy ÷ energy used by the IT equipment. 1.0 would mean zero overhead for cooling and power distribution.—2standard · The Green Grid / ISO/IEC 30134-2
Rooftop PV generationMWh/yearUsable roof area × annual solar irradiation (kWh/m²) × module efficiency × performance ratio. Irradiation from solar radiation analysis (Ladybug, Cyclops) or PVGIS.Cyclops, Dragonfly, Honeybee, Ladybug, URBANopt4student
Waste heat recoveryMWh/yearHeat produced by IT or process load × recoverable share (e.g. 80 %), compared with the heat demand of nearby users.nPro2student

Location

MetricUnitHow it is calculatedToolsUsed inOrigin
Delivery catchmentkm or minutesRadius (distance or travel time) a hub can serve with a given vehicle; number of hubs needed to cover a city.—2adapted
Distance to housingm or % of program beyond bufferDistance from noisy or hazardous logistics functions to the nearest residential building; or share of such functions outside a buffer zone.Geoportal Praha, Grasshopper3student
Land takem² or % of siteBuilding footprint (plus paved operational area) ÷ site area; compared before and after.Grasshopper6student
Public transport accessibilitym (walking distance) or scoreWalking distance from the entrance to the nearest stops, or a score by transport mode (walk, bike, tram, bus, car).Geoportal Praha1student
WalkabilityscoreWalk Score-type index, or a custom score of route continuity, crossings and destinations within walking distance.—3adapted · Walk Score

Logistics operations

MetricUnitHow it is calculatedToolsUsed inOrigin
Adaptabilitytime or effort to reconfigureTime (or cost) to reconfigure, extend or relocate the building or its partitions; checked against module dimensions and connections.—5student
Delivery timehours/minutesTime from order or dispatch to delivery at the customer; or end-to-end cycle time in the supply chain.—2adapted
Dock turnaround timeminutesTime from a truck’s arrival at the gate until departure (or until goods enter processing).—2adapted
Level of automationemployees per facility / % automated tasksShare of handling tasks done by machines, or number of employees needed per facility at a given throughput.—1student
Number of docksdocksDocks needed to handle a given throughput, from queueing or discrete-event simulation.—1student
Parking capacityspaces or m²Number of car/truck parking spaces (or parking area) provided, and their utilisation.—4student
Road freight impact% of emissions / road wearShare of freight moved by trucks vs. their share of transport emissions; road wear per truck in car equivalents (fourth-power law).—1adapted
Space utilisation% of floor area / storage capacityFloor area (or volume) actively used for storage and operations ÷ total.Grasshopper3student
Throughput per site areaunits/m²·dayGoods handled (parcels, pallets, tonnes) per day ÷ site area.—3student
Truck throughputtrucks/hourTrucks handled per hour (or day), counted in a simulation or from operational data.—2student
Yard area per dockm²/dock (or % of site)Paved manoeuvring and apron area ÷ number of docks; apron depth checked with vehicle swept-path analysis.AutoTURN1student

Safety

MetricUnitHow it is calculatedToolsUsed inOrigin
Pedestrian–vehicle conflict pointscount (or % separated routes)Number of points where pedestrian routes cross truck or van routes, counted on the site plan; or share of routes that are fully separated.—4student
Worker safety incidentsincidents/yearRecorded incidents per year (or hazard zones per layout) in operational areas.—3student

Social

MetricUnitHow it is calculatedToolsUsed inOrigin
Green space per visitorm²/personAccessible green space ÷ expected daily users or visitors.—1student
Green-core anchoring of mixed uses% of entrances (or frontage length)Building entrances (or ground-floor frontage length) of all uses within a set walking distance (e.g. 100 m) of a shared green spine ÷ total entrances (or frontage length).—7adapted
Jobs createdjobsNumber of jobs (FTE) created on site, by function.—2student
Mixed-use ratio% of floor areaFloor area of non-logistics uses (retail, workshops, community, offices) ÷ total floor area.—5student
Publicly accessible aream² or % of siteArea freely open to the public (plazas, parks, roofs, ground-floor uses) ÷ site area.Grasshopper8student
Social acceptancequalitative / survey scoreResident and user survey, or qualitative assessment, of whether the logistics activity is perceived as a benefit rather than a nuisance.—2student
Social interaction indexusers/dayObserved or estimated number of people using the public spaces of the project per day.—3student
Visual impact on neighbours% of view obstructed / screenedShare of the view from neighbouring windows obstructed by the building, or share of the built perimeter visually screened (by greenery or design).Jifto, Ladybug7student

Structure

MetricUnitHow it is calculatedToolsUsed inOrigin
Structural utilisation% of capacity / kN/m²Loads (dead, live, snow per Eurocode) and the resulting utilisation of structural members, from hand calculation or finite-element analysis.Donkey, Karamba3D1standard · Eurocode

Water

MetricUnitHow it is calculatedToolsUsed inOrigin
Impervious surface ratio% of siteSealed (paved, built, roofed without retention) area ÷ total site area × 100. The permeable ratio is the complement.Grasshopper5student
Stormwater retention volumem³Sum of the storage capacity of green roofs, swales, ponds and tanks; or design rainfall × area × (1 − runoff coefficient).—3student
Stormwater runoff reduction% vs. baseline(Runoff before − runoff after) ÷ runoff before. Runoff = runoff coefficient × design rainfall × area, summed over surface types.Rainflow-Sim4student
Water consumptionm³/yearMetered or estimated annual water use; for data centres often normalised per kWh of IT energy (WUE).—2student
Water reuse share% of demandReused rain or grey water ÷ total water demand × 100.—4student