Challenge

Most European warehouses are built speculatively: at the design stage nobody knows who the tenant will be, what they will store or handle, or how long they will stay. Developers manage this uncertainty through standardisation and a simple rule — bigger is safer. Floor area, clear height, floor loads, docks, parking and building services are sized for any possible tenant rather than for a known one.

The result is a building that fits many tenants adequately and none precisely. Oversizing costs embodied carbon, land and money, and the parts that a future tenant would value most (daylight, staff facilities, connection to the neighbourhood) are the first to be cut, because they cannot be priced at the sale.

Why it matters

  • The first owner is usually a developer-trader who sells at or before completion, so long-term operating benefits are not captured in the developer’s return.
  • Projects where the user is known early, such as Bestseller Logistics Center West and its predecessor in Haderslev, show that a precise brief allows a precise and higher-quality design.
  • Industry partners report building services oversized by up to 50 % because requirements are poorly formulated (partner estimate).

Metrics that inform the decision

MetricWhy
Oversizing ratioMeasures the gap between provided and needed capacity
Space utilisationShows how much of the building is actually used
AdaptabilityThe alternative to oversizing: design for change instead of for every case
Embodied carbon intensityCarbon cost of the extra volume and structure
Land takeLand cost of the extra footprint and yard

Buildings that change slower than logistics · Land take of logistics buildings · Embodied carbon of new and demolished warehouses

Possible levers (open question)

  • Process: know the tenant earlier (build-to-suit instead of speculative).
  • Design: adaptability and modularity instead of oversizing.
  • Market: long-hold investment models (see Nexus Logistics Park).
  • City: quality requirements as a condition of the permit.

Common misreading

Not this: every capacity sized for the largest possible tenant “to be safe”. Why it fails: most tenants never use the extra capacity, while its carbon, land and cost are paid in full. Do this: design a base that fits the likely range of tenants and can be extended or adapted. Measure with: Oversizing ratio, Space utilisation, Adaptability. Evidence: expert statements; no measured case yet.

Evidence

The challenge rests mainly on expert and partner statements. No case study in the studio measured oversizing directly, and no tool calculates it. See Evidence gaps.