Reference project · published
A built or planned logistics project from practice, outside the studio. Figures are as published by the developer, the architect or a cited source.
| Developer | Sogaris |
| Architect | A26 |
| Location | Chapelle International eco-district, Paris 18e, France |
| Year | 2018 |
| Stage | built |
| Typology | multimodal logistics hotel with mixed programme: urban logistics, offices, sports, urban farm |
| Floor area | 41,500 m² |
| Website | www.sogaris.fr/fiche/chapelle-international |
| Status | published |
Also known as: Chapelle International logistics hotel
Chapelle International beside the rail lines of Paris 18e, with greenhouses and sports pitches visible on the roof. Photo: © Dubreuil, Sogaris, sogaris.fr.
Project
Chapelle International is a logistics hotel (“hôtel logistique”) in the new Chapelle International eco-district in Paris 18e, built by Sogaris and designed by the architects A26. Sogaris describes it as its first logistics hotel in Greater Paris and the first example of a new asset class. The building was inaugurated in 2018 and has 41,500 m² of floor area. Its 15,000 m² logistics ground floor keeps the capacity to host internalised rail freight operations in the future.
The other activities on the site serve the neighbourhood: sports pitches, an urban farm, a restaurant and a fitness club. A district heating plant fed by the energy of a data centre heats the logistics hotel and buildings of the neighbourhood. The project won the MIPIM Awards 2018 in the category “best industrial and logistics development”.
Source: Sogaris, Chapelle International (paraphrased from French).
Metrics and evidence
| Metric | Wording in the source | Value | How it was calculated | Tool | Source |
|---|---|---|---|---|---|
| Mixed-use ratio | share of activity | 60% urban logistics, 20% offices, 20% other | Share of activity as published; basis (area or rent) not stated. | not stated | Sogaris, Chapelle International |
| Jobs created | tenants / jobs | 11 tenants, 350 jobs | Count as published. | not stated | Sogaris, Chapelle International |
| Waste heat recovery | district heating fed by a data centre | not stated | — | not stated | Sogaris, Chapelle International |
Tools
- Not stated by the developer.
Open questions
- Site area, number of storeys and the floor areas of offices, sports and urban farm are not published on the developer’s page.
- The share of the logistics floor actually served by rail freight is not stated; the page speaks of capacity for future operations.
Connections
- Challenges addressed: Closed sites that give little back to the city, Last-mile delivery emissions and traffic, Land take of logistics buildings, Waste heat and cooling of data centres
- Metrics reported: Mixed-use ratio, Jobs created, Waste heat recovery
- Sources: Sogaris, Chapelle International
- Insights: A logistics hotel with football pitches on top
- Ambitions: Mixed use and function stacking, Public access and community use, Green and productive roofs, Shared waste heat, Fewer and cleaner last-mile trips, Logistics as part of the city
Something wrong or missing? Suggest a correction