Reference project · published

A built or planned logistics project from practice, outside the studio. Figures are as published by the developer, the architect or a cited source.

DeveloperIPUT Real Estate Dublin
LocationDublin, Ireland (M50 junction 5 / N2, 10 min from Dublin Airport)
Stageunder construction
Typologylogistics park: 17 logistics units with offices, built in phases
Site area182 acres
Floor area2.5 million sq ft (17 units)
CertificationsLEED Gold and BER A1 (targeted)
Websitewww.nexuslogisticspark.com
Statuspublished

Also known as: Nexus

🌐 Open the project website

Visualisation of Nexus Logistics Park, with the greenway, sports pitches and Nexus Twelve. Image: IPUT Real Estate Dublin, nexuslogisticspark.com.

Project

Nexus Logistics Park is a logistics park near Dublin developed and managed by IPUT Real Estate Dublin. It is located by the M2 and M50 motorways, 10 minutes from Dublin Airport and the Dublin Port Tunnel. The developer describes 17 logistics units with 2.5 million sq ft of warehousing on 182 acres of land. Units 1–9 form the first phase, and Units 10–17 are labelled Phase 2. Unit Four was ready for occupation in April 2026.

According to the developer, every unit can be built with a glue-laminated timber (glulam) frame instead of steel, and each unit “has the potential to be delivered to a net zero carbon standard”. The units target LEED Gold and BER A1 and have a 14 m clear internal height. They also have roof-mounted photovoltaic panels, NZEB-compliant fabric and MEP design, sub-metering, LED lighting with daylight harvesting, and rainwater harvesting. Smart metering monitors electricity use, warehouse temperature and indoor air quality.

The park is described as “set on a 64-acre greenway” and planted with 40,000 native trees and shrubs. It includes an indoor gym, a full-size astro pitch, two padel courts, cycling and jogging paths, and a central pavilion. The developer does not explain how the 64-acre greenway relates to the 182-acre site.

Source: IPUT, Nexus Logistics Park website.

How the developer frames the challenge

  • Sustainable logistics: “setting new benchmarks for sustainability, design and wellbeing”
  • Net zero carbon units through timber as an alternative to steel
  • On-site renewable energy and energy monitoring
  • Placemaking and well-being for the people who work in the park

Metrics and evidence

Every metric that can be read from the developer’s website, with the value as published and the page it comes from. Where the website names a feature but gives no figure, the value is “not stated”.

MetricDeveloper’s wordingValueHow it was calculatedToolPage
Tree count and canopy covernative trees and shrubs40,000 trees and shrubsPlanting count as published; method not stated.not statedPlacemaking
Parking capacitycar / EV / bicycle / HGV parkingUnit Four: 81 car spaces (9 EV), 58 bicycle spaces, 21 HGV spaces; up to 10% of car spaces can have EV chargingCount of spaces per unit.not statedUnit Four, Sustainability
Number of docksdock levellers, euro docks, level access doorsUnit Four: 9 dock levellers, 2 euro docks, 2 level access doors; yard depth 37.5–50 mCount per unit.not statedUnit Four
Rooftop PV generationroof mounted photovoltaic solar panelsnot stated—not statedSustainability
Energy use intensityNZEB compliant fabric and MEP design; BER A1not stated—not statedSustainability
Embodied carbon intensitytimber as an alternative to steel; net zero carbon potentialnot stated—not statedSustainability
Indoor air qualitysmart metering of indoor air qualitynot statedMonitored by the developer’s smart metering.not statedSustainability
Water reuse sharerainwater harvestingnot stated—not statedSustainability

Tools

  • Not stated by the developer.

Insights from the lectures and publications that bear on the developer’s claims. They are not about Nexus itself.

Open questions

  • No figures are published for PV capacity or yield, energy use intensity, embodied carbon or the glulam alternative, so the sustainability claims cannot yet be traced to values.
  • The 182-acre site and the 64-acre greenway are not reconciled on the website, so no green area share can be derived.
  • The website does not say whether the sports facilities and paths are open to the public or only to people working in the park.
  • The architect and the design tools are not named.