Metric · draft
A measurable indicator (students often call it a KPI) used as evidence for a design decision.
| Category | Water |
| Unit | % of demand |
| How it is calculated | Reused rain or grey water ÷ total water demand × 100. |
| Origin | student |
| Status | draft |
Also known as: Rainwater reuse potential · Grey water reuse
What it measures
Share of water demand covered by collected rainwater or treated grey water.
Calculation
Reused rain or grey water ÷ total water demand × 100.
Connections
- Used in case studies: Adam Večeřa, Marek Nový, Natalie Žižková, Sara Gani
- Informs decisions on: Stormwater and sealed surfaces on logistics sites
Something wrong or missing? Suggest a correction