Trade-off · published

A recurring conflict between two design aims or metrics, found in the student projects or reported by experts and publications, with how the projects handled it.

SummaryLong spans, bridging structures and heavier loads give flexibility and free ground, but need more material, carbon and cost.
Statuspublished

The conflict

Large column-free halls, buildings over infrastructure and rooftop uses all ask more of the structure. Every gain in span or load has to be paid for in material, which shows up as embodied carbon and construction cost.

In the student projects

  • Adéla Berkovitz — Rooftop car parking would save land but needs heavier columns for the larger loads (structural material/embodied carbon), so parking stays on the ground (consultation).
  • Robin Jesenský — A thicker copper shell (10 mm vs 5 mm) doubles copper mass and its embodied GWP, a choice the student lists without resolving.
  • Julia Kopác — Cost to build roughly doubles (600 to 1,220 EUR/m²) in exchange for large gains in uninterrupted greenery, walkability, noise reduction and lower sealed-surface share.
  • Julia Kopác — Choosing a vertical, above-ground scheme over an underground road option was driven by the embodied-carbon KPI, at the expense of a more complex long-span structure.

As reported by the student; see each case study for the page in the portfolio.

What experts say

Paraphrased from the lecture; see each insight for its source and evidence status.

Connections


Something wrong or missing? Suggest a correction