Ambition · published
An aim a design pursues, taken from how the students framed their briefs. Domains gather them through their projects.
| Category | Carbon & circularity |
| Summary | Buildings are assembled from modules and prefabricated parts that can be added, joined, stacked or moved. |
| Status | published |
Ambition
Buildings are assembled from modules and prefabricated parts that can be added, joined, stacked or moved.
In the student projects
- Amy Naprstek — project description: “a relocatable storage system built from prefabricated steel-framed, aluminium-clad blocks in three sizes”
- Julia Kopác — project description: “the modular system combines warehouse, retail-warehouse and crossing modules”
- Sara Sulollari — project description: “a U-shaped wall of reused shipping containers”
- Robin Jesenský — project description: “a row of six modular server halls”
- Eva Kažukolovaitė — “Adaptable modular logistics infrastructure”
- Roshni Basu — project description: “a modular Urban Logistic PlugIn unit … stackable and joinable”
Unlabelled quotes are the challenges as the students framed them; lines marked project description or trade-offs quote those sections of the case study (as reported by the student).
In practice
- Ricola Kräuterzentrum — as described by the architects: “The prefabricated rammed earth elements are made in a nearby factory”
Lines in In practice quote the reference project notes, which report what the developer or architect published, or paraphrase a studio lecture.
Where are the challenges, case studies and domains?
They appear automatically below under Connections, and in Obsidian under the
auto_properties.
Connections
- Challenges: Buildings that change slower than logistics
- Case studies: Amy Naprstek, Eva Kažukolovaitė, Julia Kopác, Robin Jesenský, Roshni Basu, Sara Sulollari
- Domains: Adaptive and Modular Logistics, Energy Symbiosis, Micro-Hubs and Urban Mobility
- Reference projects: Ricola Kräuterzentrum
- Metrics: Adaptability, Construction cost, Design for disassembly score, Structural utilisation
- Tools (via metrics): Donkey, Galapagos, Karamba3D
- Strategies (through its projects): Conflict-point mapping for separated flows, Green and blue surface accounting, KPI matrix comparison of design variants, Service-radius analysis for hub networks, Wind simulation for sheltered layouts
Something wrong or missing? Suggest a correction