Case study · draft

A student project from the Rethinking.Logistics studio showing how tools deliver metrics for decisions.

StudentLindsay Daphne Macuja
ProjectHumanizing Logistics
Portfolioheyzine.com/flip-book/1c11e500f0.html
StudioAD2 (Architectural Design 2)
Year2026
LocationStrojírenská 175/25, 155 21 Zličín, Prague, Czech Republic
Typologylast-mile logistics hub with public market, local businesses and offices (multi-tenant hybrid), replacing an existing big-box warehouse
Statusdraft

📖 Open the portfolio

Project

The site is an existing 13,029 m² sawtooth-roof ‘big box’ warehouse in a mixed industrial–residential district of Zličín, causing noise, truck congestion, single-point access and a hostile edge to housing and schools. The project reframes it as a last-mile logistics hub that is also a civic asset, structured around the Society–Economy–Environment triad. Key moves are a reworked sawtooth roof carrying PV and daylight, a green roof over the public-facing programme, shops/markets and offices along the park edge, a landscaped green–blue buffer linking two lakes, and a low-carbon material palette (25% GGBS concrete, 97% recycled reinforcement) verified in One Click LCA. A Grasshopper script was used to locate storage away from residential zones (distance buffer index).

How the student framed the challenge

  • Urban integration of logistics buildings
  • Embodied carbon of warehouse structures
  • Biodiversity and green–blue connectivity on logistics sites
  • Mixed-use / social value of logistics hubs

Metrics and evidence

Every metric the project used, as named by the student, with the value, the calculation and the portfolio page.

MetricStudent’s wordingValueHow it was calculatedToolPage
Distance to housingdistance buffer indexBaseline 25% → proposal 85%Parametric script tests spatial iterations of the storage volume and scores how well each location maximises distance from sensitive residential areas.Grasshopper9
Green area ratiogreen environmentBaseline 35% → proposal 70%Share of site/buffer programmed as landscaped green space; method not explained.not stated9
Biodiversity net gainlake biodiversityBaseline 15% → proposal 85%Qualitative score based on introduced vegetation zones (emergent, riparian, aquatic, wet meadow plants); calculation not explained.not stated10
Embodied carbon intensitylow carbon materials (kg CO2e/m²)Baseline 420 → proposal 354 kgCO2e/m² (Carbon Class B)Whole-life LCA of structure and envelope in One Click LCA; comparison of conventional materials with 25% GGBS concrete and 97% recycled-content reinforcement.One Click LCA10
Embodied carbon intensityTonnes CO2e5,172 tCO2e; A1–A3 ≈89%, B4–B5 6%, A4 2%, C3 2%, C2 1%; foundations/substructure 43%, horizontal structures 31%, vertical structures and façade 27%Sum of life-cycle GWP over modules A1–A4, B4–B5, C1–C4 in One Click LCA.One Click LCA10
Embodied carbon intensitykg CO2e/m²/year5 kgCO2e/m²/yearEmbodied carbon divided by floor area and reference study period, output of One Click LCA.One Click LCA10
Social cost of carbonSocial cost of carbon258,618 € (text claims mitigation of over $258,000)Monetised embodied emissions reported by One Click LCA.One Click LCA10
Energy use intensityEnergy Use Intensity (EUI) analysisMonthly peaks approx. 75,000 kWh in January/December; approx. 45,000–50,000 kWh in summer (read from chart)Energy simulation of zoned massing (program types supermarket/produce, large office, medium office/storage), split into heating, cooling, lighting and technology per month.Grasshopper energy model (Honeybee program types – visual inference)12, 20
On-site renewable energy shareenergy offsetBaseline 102.5 kW → energy offset 69.7 kWComparison of baseline demand with demand offset by PV arrays on the sawtooth roof; method not explained.not stated12
Mixed-use ratioeconomic & social useBaseline 50% → proposal 80%Share of building/edge given to public-facing shops, markets, small businesses and community uses; method not explained.not stated12
CapEx–OpEx ratioCapEx/OpEx ratio≈60% CapEx / 40% OpEx (estimate); business electricity price assumed 4.70 CZK/kWhQualitative estimate: higher construction cost for smaller modules offset by lower operating cost from daylight and natural ventilation.manual / formulaquestionnaire (Economy 1, Economy 3)

Tools

  • One Click LCA — Whole-life embodied carbon, carbon class, social cost of carbon, material comparison
  • Grasshopper — Spatial optimisation script placing storage away from residential zones (distance buffer index); energy/EUI massing model
  • Honeybee (probable — inferred from the graphics, not named) — Energy model with OpenStudio program types (2019::SuperMarket::Produce, 2019::LargeOffice::ClosedOffice, 2013::MediumOffice::Storage) – visual inference

Trade-offs

  • Breaking the warehouse into smaller human-scale modules improves daylight and safety but increases façade area by about 30%, raising embodied carbon and construction cost (questionnaire).
  • More building edges and public-facing modules improve street activity but increase maintenance and long-term operational cost (questionnaire).

Decision

The One Click LCA comparison supported choosing low-carbon concrete with 25% GGBS and 97% recycled steel reinforcement (420 → 354 kgCO2e/m², class B). The distance-buffer script set storage at the back of the site, away from housing, and the energy profile supported putting PV on the sawtooth roof. Comparing typologies (cross-dock, regional and national DC) supported keeping last-mile logistics as the only one that fits the residential context.

Open questions

  • Concept moved too fast without enough site layers or evidence on ecology and species movement between the two lakes (mid-term consultation).
  • Lacked deeper research and a clear approach before starting the concept.
  • KPI understanding and evidence base need more study; not enough alternatives tested (no second variant at the other end of the modularity trade-off).
  • Methods behind the percentage KPIs (green environment, lake biodiversity, economic & social use) are not documented; energy offset is given in kW without explaining whether this is peak power or energy.