Challenge · published
A design challenge tackled with evidence-based design.
| Category | Freight |
| Status | published |
Also known as: Automation and operational efficiency of logistics
Challenge
Automation and new technology change how much space, energy and labour logistics needs — and the quality of the remaining jobs.
Design questions
- How many workers does the facility need at a given throughput?
- How does automation change the building’s size and energy use?
- How fast can goods move through the supply chain?
Where are the metrics, tools and case studies?
They appear automatically below under Connections, and in Obsidian under the
auto_properties.
Connections
- Case studies: Johannes Berger
- Metrics: Carbon per pallet handled, Delivery time, Dock turnaround time, Energy per package delivered, Jobs created, Level of automation, Space utilisation, Throughput per site area
- Insights: 350 people vs 6,000 next door, 8–10% of the area, 50% of the people, A warehouse run by four people, Automated trucks will not change the loading dock, Automation is a wage-driven substitution, not a technology story, Czech height limits are quietly repelling investment, Fit-out can cost more than the building, Full automation would need power plants bigger than the logistics, Half a billion euros of technology under one roof, Height buys efficiency and buys a fire problem, Robots don’t need a view — which makes the box more modular, The MHE designed the building, not the architect, Warehouses break the user-comfort premise, What will we do if we replace every job by a robot
- Reference projects: Bestseller Logistics Center West
- Ambition: Efficient automated operations
- Tools (via metrics): Grasshopper